Home » Others » CURRENT TENDERS

CURRENT TENDERS

S.no

Tender No

Name Of Work

Bid Document
Downloading Start Date

Bid Document
Downloading End Date

Last Date &
Time for
Receipt of Bids

1

09/2011-12/EE-VII/VUDA,
Dt. 2.02.2012

Providing Laying of Armoured Aluminium cable (underground cable) Lighting to Jogging Track at kailasagiri

2/2/2012
9:00PM

9/2/2012
1:00PM

9/2/2012 3:00PM

2

08/2011-12/EE-VII/VUDA,
Dt. 2.02.2012

Providing 30W LED Lamp Fixture to Jogging Track at Kailasagiri

2/2/2012
9:00PM

9/2/2012
1:00PM

9/2/2012 3:00PM

3

08/2011-12/EEVII/VUDA, Dt.02.02.2012

Providing Decorative Ornamental Electrical Poles to Jogging Track at Kailasagiri.

2/2/2012
8:00PM

9/2/2012
1:00PM

9/2/2012 3:00PM

4

20/2011-12/EE-IV/VUDA, Dt.02.02.2012.

Providing Ductable Air Conditioning to Kurusura Submarine Museum Supply, Delivery, Ducting, Installation Commenced, Testing etc.,

2/2/2012
8:00PM

7/2/2012
1:00PM

7/2/2012 3:00PM

5

9/2011-12/EEIII/VUDA,
Dt.25-01-2012

Construction of Compound wall (West side) and special repairs to Sri Rao Gopal Rao Kalakshetram at Anakapalli

25/1/2012 6:00PM

8/2/2012
1:00PM

8/2/2012 3:00PM

6

6/2011-12/EE- VIII/VUDA,
Dt.24-01-2012

Construction of VRCC foundations including jungle clearance for the Steel Fabricated Support Structure of "VUDA KAILASAGIRI" (except 'V') Logo / Sign along hill slopes down the Railway track of Kailasagiri

25/1/2012 8:00AM

8/2/2012
1:00PM

8/2/2012 3:00PM

7

6/2011-12/EE- VIII/VUDA,
Dt.24-01-2012

Manufacturing, Supply and Erection of Steel Fabricated Support Structure with Sand blasting and Epoxy painting with cold tar for VUDA KAILASAGIRI (Except 'V') Logo/sign along hill slopes down the Railway track of Kailasagiri

25/1/2012 8:00AM

8/2/2012
1:00PM

8/2/2012 3:00PM

8

19/2011-12/EE-IV/VUDA Dt.14.12.2011.

Providing structural steel renewable on HULL Casing of Kurusura Submarine Museum at Beach Road, Visakhapatnam (3rd call)

24/1/2012 8:00PM

1/2/2012
1:00PM

1/2/2012 3:00PM

9

18/2011-12/EE-IV/VUDA, Dt.23.01.2012.

Widening of Existing B.T.Road from Telugu Museum, upto Railway Track on top of Kailasa Hill.

23/1/2012 8:00PM

6/2/2012
1:00PM

6/2/2012 3:00PM

10

8/2011-12/EEIII/VUDA, Dt.20-01-2012

Providing External Jogging track in Dr.Y.S.R. VUDA Central Park, Old Central Jail premises at Visakhapatnam.

20/1/2012 8:00PM

3/2/2012
1:00PM

3/2/2012 3:00PM

11

8/2011-12/EEIII/VUDA, Dt.20-01-2012

Providing surface parking at East, South, West & North sides in Dr.Y.S.R. VUDA Central Park, Old Central Jail premises at Visakhapatnam.

20/1/2012 8:00PM

3/2/2012
1:00PM

3/2/2012 3:00PM

12

6/2011-12/EEIII/VUDA, Dt.03-01-2012

Construction of Retaining walls in Dr.Y.S.R. VUDA Central Park at Old Central Jail premises, Visakhapatnam.

3/1/2012
9:00PM

18/1/2012 1:00PM

18/1/2012 3:00PM

13

7/2011-12/EEIII/VUDA, Dt.03-01-2012

Providing Site Grading in Dr.Y.S.R. VUDA Central Park at Old Central Jail premises at Visakhapatnam.

3/1/2012 8:00PM

18/1/2012 1:00PM

18/1/2012 3:00PM

14

5/2011-12/EEIII/VUDA, Dt.28-12-2011

Regularization of Gedda in K.L. Rao Nagar, Gajuwaka, Visakhapatnam.

28/12/2011 8:00PM

11/1/2012 1:00PM

11/1/2012 3:00PM

15

17/2011-12/EE-IV/VUDA,
Dt. 21-12-2011

Providing Annual Maintenance of Kurusura Submarine Museum at Visakhapatnam for the year 2012 (From 01.01.2012 to 31.12.2012).

21/12/2011 10:00PM

29/12/2011 1:00PM

29/12/2011 3:00PM

16

16/2011-12/EE-IV/VUDA, Dt.21.12.2011

Construction of Protection works to the proposed Car Parking in front of Floral Clock on Kailasa Hill

21/12/2011 8:00PM

31/12/2011 1:00PM

31/12/2011 3:00PM

17

08/2011-12/EE II/VUDA,
Dt.20-12-2011

Providing GSB, WMM, BT Road and SW Drains & Central Divider at Arasavalli Jn. to Collector's office Jn., Srikakulam.

21/12/2011 5:00PM

11/1/2012 1:00AM

11/1/2012 3:00PM

18

07/2011-2012/EE-VII/VUDA, Dt:21-12-2011

Providing BT Road, Slab Culverts and CD works ar Rear side of PAC Building situated at Lova Thota area (Up Hill) at Sri Varaha Laxmi Narasimha Swamy Devastanam, Simhachalam, Visakhapatnam District. ( 2nd call )

21/12/2011 8:00PM

28/12/2011 1:00PM

28/12/2011 3:00PM

19

07/2011-12/EE II/VUDA,
Dt.17-12-2011

Widening and providing VDF cement concrete pavement including construction of SW drains and CD Works to the connecting road to RIMS Hospital at Srikakulam.

17/12/2011 8:00PM

31/12/2011 1:00PM

31/12/2011 3:00PM

20

4/2011-12/EE- VIII/VUDA,
Dt.13-12-2011

Providing Face lift to external colour scheme of Row Houses at Rushikonda.

14/12/2011 1:00PM

21/12/2011 1:00PM

21/12/2011 3:00PM

21

10/2011-12/EE-IV/VUDA
Dt.14.12.2011.

Providing structural steel renewable on HULL Casing of Kurusura Submarine Museum at Beach Road, Visakhapatnam (2nd call)

14/12/2011 8:00PM

28/12/2011 1:00PM

28/12/2011 3:00PM

22

06/2011-12/EEVII/VUDA,
Dt.02.12.2011

Providing VRCC Retaining Wall at Chainage 1300 for the Cycle Track Embankment of Kailasagiri.

2/12/2011 10:00PM

9/12/2011 1:00PM

9/12/2011 3:00PM

23

06/2011-12/EEVII/VUDA, Dt.02.12.2011

Construction of Compound Wall (Raisings) at Jogging Track, Phase-II, KailasagiriKailasagiri.

2/12/2011 10:00PM

9/12/2011 1:00PM

9/12/2011 3:00PM

24

06/2011-12/EEVII/VUDA, Dt.02.12.2011

Construction of Toe wall and Revetment, Drains with CC grouting for embankments of Jogging Path & Cycle Track Phase-II at Foot of Kailasagiri

2/12/2011 10:00PM

9/12/2011 1:00PM

9/12/2011 3:00PM

25

06/2011-12/EEVII/VUDA, Dt.02.12.2011

Providing WMM & BTSD Road to Cycle Track at Foot of Kailasa Hill, MV Palem.

2/12/2011 10:00PM

9/12/2011 1:00PM

9/12/2011 3:00PM

26

14/2011-12/EE-IV/VUDA, Dt.01.12.2011

Supply and delivery of BRP-320/1X24LED Street Light Fixtures along Ghat Road at Kailasa Hill.

2/12/2011 8:00PM

9/12/2011 1:00PM

9/12/2011 3:00PM