CURRENT TENDERS
S.no |
Tender No |
Name Of Work |
Bid Document |
Bid Document |
Last Date & |
1 |
Providing Laying of Armoured Aluminium cable (underground cable) Lighting to Jogging Track at kailasagiri |
2/2/2012 |
9/2/2012 |
9/2/2012 3:00PM |
|
2 |
Providing 30W LED Lamp Fixture to Jogging Track at Kailasagiri |
2/2/2012 |
9/2/2012 |
9/2/2012 3:00PM |
|
3 |
Providing Decorative Ornamental Electrical Poles to Jogging Track at Kailasagiri. |
2/2/2012 |
9/2/2012 |
9/2/2012 3:00PM |
|
4 |
Providing Ductable Air Conditioning to Kurusura Submarine Museum Supply, Delivery, Ducting, Installation Commenced, Testing etc., |
2/2/2012 |
7/2/2012 |
7/2/2012 3:00PM |
|
5 |
Construction of Compound wall (West side) and special repairs to Sri Rao Gopal Rao Kalakshetram at Anakapalli |
25/1/2012 6:00PM |
8/2/2012 |
8/2/2012 3:00PM |
|
6 |
Construction of VRCC foundations including jungle clearance for the Steel Fabricated Support Structure of "VUDA KAILASAGIRI" (except 'V') Logo / Sign along hill slopes down the Railway track of Kailasagiri |
25/1/2012 8:00AM |
8/2/2012 |
8/2/2012 3:00PM |
|
7 |
Manufacturing, Supply and Erection of Steel Fabricated Support Structure with Sand blasting and Epoxy painting with cold tar for VUDA KAILASAGIRI (Except 'V') Logo/sign along hill slopes down the Railway track of Kailasagiri |
25/1/2012 8:00AM |
8/2/2012 |
8/2/2012 3:00PM |
|
8 |
Providing structural steel renewable on HULL Casing of Kurusura Submarine Museum at Beach Road, Visakhapatnam (3rd call) |
24/1/2012 8:00PM |
1/2/2012 |
1/2/2012 3:00PM |
|
9 |
Widening of Existing B.T.Road from Telugu Museum, upto Railway Track on top of Kailasa Hill. |
23/1/2012 8:00PM |
6/2/2012 |
6/2/2012 3:00PM |
|
10 |
Providing External Jogging track in Dr.Y.S.R. VUDA Central Park, Old Central Jail premises at Visakhapatnam. |
20/1/2012 8:00PM |
3/2/2012 |
3/2/2012 3:00PM |
|
11 |
Providing surface parking at East, South, West & North sides in Dr.Y.S.R. VUDA Central Park, Old Central Jail premises at Visakhapatnam. |
20/1/2012 8:00PM |
3/2/2012 |
3/2/2012 3:00PM |
|
12 |
Construction of Retaining walls in Dr.Y.S.R. VUDA Central Park at Old Central Jail premises, Visakhapatnam. |
3/1/2012 |
18/1/2012 1:00PM |
18/1/2012 3:00PM |
|
13 |
Providing Site Grading in Dr.Y.S.R. VUDA Central Park at Old Central Jail premises at Visakhapatnam. |
3/1/2012 8:00PM |
18/1/2012 1:00PM |
18/1/2012 3:00PM |
|
14 |
Regularization of Gedda in K.L. Rao Nagar, Gajuwaka, Visakhapatnam. |
28/12/2011 8:00PM |
11/1/2012 1:00PM |
11/1/2012 3:00PM |
|
15 |
Providing Annual Maintenance of Kurusura Submarine Museum at Visakhapatnam for the year 2012 (From 01.01.2012 to 31.12.2012). |
21/12/2011 10:00PM |
29/12/2011 1:00PM |
29/12/2011 3:00PM |
|
16 |
Construction of Protection works to the proposed Car Parking in front of Floral Clock on Kailasa Hill |
21/12/2011 8:00PM |
31/12/2011 1:00PM |
31/12/2011 3:00PM |
|
17 |
Providing GSB, WMM, BT Road and SW Drains & Central Divider at Arasavalli Jn. to Collector's office Jn., Srikakulam. |
21/12/2011 5:00PM |
11/1/2012 1:00AM |
11/1/2012 3:00PM |
|
18 |
Providing BT Road, Slab Culverts and CD works ar Rear side of PAC Building situated at Lova Thota area (Up Hill) at Sri Varaha Laxmi Narasimha Swamy Devastanam, Simhachalam, Visakhapatnam District. ( 2nd call ) |
21/12/2011 8:00PM |
28/12/2011 1:00PM |
28/12/2011 3:00PM |
|
19 |
Widening and providing VDF cement concrete pavement including construction of SW drains and CD Works to the connecting road to RIMS Hospital at Srikakulam. |
17/12/2011 8:00PM |
31/12/2011 1:00PM |
31/12/2011 3:00PM |
|
20 |
Providing Face lift to external colour scheme of Row Houses at Rushikonda. |
14/12/2011 1:00PM |
21/12/2011 1:00PM |
21/12/2011 3:00PM |
|
21 |
Providing structural steel renewable on HULL Casing of Kurusura Submarine Museum at Beach Road, Visakhapatnam (2nd call) |
14/12/2011 8:00PM |
28/12/2011 1:00PM |
28/12/2011 3:00PM |
|
22 |
Providing VRCC Retaining Wall at Chainage 1300 for the Cycle Track Embankment of Kailasagiri. |
2/12/2011 10:00PM |
9/12/2011 1:00PM |
9/12/2011 3:00PM |
|
23 |
Construction of Compound Wall (Raisings) at Jogging Track, Phase-II, KailasagiriKailasagiri. |
2/12/2011 10:00PM |
9/12/2011 1:00PM |
9/12/2011 3:00PM |
|
24 |
Construction of Toe wall and Revetment, Drains with CC grouting for embankments of Jogging Path & Cycle Track Phase-II at Foot of Kailasagiri |
2/12/2011 10:00PM |
9/12/2011 1:00PM |
9/12/2011 3:00PM |
|
25 |
Providing WMM & BTSD Road to Cycle Track at Foot of Kailasa Hill, MV Palem. |
2/12/2011 10:00PM |
9/12/2011 1:00PM |
9/12/2011 3:00PM |
|
26 |
Supply and delivery of BRP-320/1X24LED Street Light Fixtures along Ghat Road at Kailasa Hill. |
2/12/2011 8:00PM |
9/12/2011 1:00PM |
9/12/2011 3:00PM |











